From a sketch to production-ready CAD in three weeks.
Project Tamp hand coffee grinder
Material 6061 aluminium
Sheet 1 of 14
We are eight industrial designers and mechanical engineers. You bring the idea; we hand back a part your factory can quote, tool and make, with the 3D model for your website in the same folder.
CAD files
Open real CAD files, right in the page.
Clients and their suppliers open our STEP and 3MF files here before they download anything. Pick a file under the viewer, turn it, zoom into a fillet.
The two STEP files are public test parts from the U.S. National Institute of Standards and Technology. We show them because client files stay private. The 3MF is our grinder.
STEP · 3MF
STEP · 3MF · GLB
What you get at handover

STEP
Exact geometry for tooling
AP242, so your toolmaker can quote from the file, not from photos.
3MF
Print-ready meshes
For prototypes and fit checks, with units and colour kept.
GLB
The model for your website
The same part, light enough for a product page and AR.
Finishes
Week one and week three, on the same model.
Our first print is grey resin. By week three the same part is in its production finish. Switch between them: the shape stays, only the finish changes.
01
Week 1
SLA prototype
Printed on day four. Good enough to hold, grind with and argue about.
02
Week 3
Production
Bead-blasted aluminium, brass adjuster, walnut knob. What the factory makes.
03
Option
Black anodised
A second finish option we costed for the client. The same parts, a different line on the order sheet.
Details
The details we argued about.
Tap a number and the camera moves to that detail. The plus pin opens a photo of our first print.
Walnut knob
Turned from one piece of oiled walnut, sized for a pinch grip rather than a fist.
Folded crank
A 3 mm stainless rod bent once, so the arm clears the hand on the body. It lifts off for travel.
Grip band
Overmoulded TPE with 72 fine flutes. It stops the body turning in your hand without feeling rubbery.
Grind adjuster
A brass ring with 48 clicks, each moving the burr 25 microns. The click is a sprung ball, not a detent in plastic.
Catch cup
Holds 30 g of ground coffee and twists off on a single-start thread, so it never cross-threads.
Sample file
Download a sample STEP file.
Want to check that our files open cleanly in your CAD system before you hire us? Press the download button in the corner of the viewer. It is a 320 KB AP203 file of a machined test part.
320 KB
AP203 file
Sample part: NIST FTC-10, a public test part. No endorsement by NIST.
3D Viewer Premium
How this page is built
Every 3D section on this page is the standard 3D Viewer block. The settings below use the control names you will find in the plugin.
| Section | What it uses | Settings |
|---|---|---|
| Hero | Auto-rotate, studio HDR lighting | Auto Rotate on, 0.8 s delay. Environment Image = studio HDR |
| CAD files | Advanced viewer, 3 files with thumbnails | Viewer = Advanced (Online3DViewer) for STEP and 3MF. Multiple models, thumbnails and arrows, edges drawn |
| Finishes | Material variants built into the GLB | Variant Selector on (KHR_materials_variants). The finish buttons are a short page script that picks from the viewer’s Variant menu |
| Details | 5 Waypoint hotspots, 1 Image hotspot | Hover Popup Card. Pin Icon: Number and Plus. Each waypoint stores orbit, target and FOV |
| Sample file | Advanced viewer with the Download button | Download button on. The plain link below it points at the same file |
| Page design | Fonts, colours, header and footer | Page CSS only. The viewer buttons and pins are restyled with CSS; the plugin settings are unchanged |
What this page does not do
- The finish buttons switch the model’s own materials. It is not a configurator, and nothing is priced.
- The STEP files show geometry only. Tolerances and notes stored in a STEP file are not displayed.
- We do not show IGES here. The advanced viewer opens IGES files, but this page has none.
- The project buttons are placeholders; there is no form behind them.
Model credits
- Tamp grinder (GLB and 3MF) and the first-print image: made by bPlugins for this demo, CC0
- CTC-02, FTC-07 and FTC-10 test parts: NIST MBE PMI Validation and Conformance Testing project, U.S. Government work (public domain in the U.S.). Shown as sample data; no endorsement by NIST
- Studio HDR (studio_kontrast_03): Poly Haven, CC0
Northgate Design Lab
Three weeks.
Week 1: concept
Sketches, a first print and a call with you on day five.
Week 2: engineering
Wall thickness, draft angles and fasteners, checked with your factory.
Week 3: release
STEP, drawings and the web model, signed off together.

Start a project.
Send a sketch, a photo or a broken part. We reply within two working days with a fixed price for the three weeks.